Home ProductsSewage Treatment Solutions

Mbr Containerized Package Integrated Sewage Treatment Plant Mobile Compact

Certification
China KaiYuan Environmental Protection(Group) Co.,Ltd certification
China KaiYuan Environmental Protection(Group) Co.,Ltd certification
I'm Online Chat Now

Mbr Containerized Package Integrated Sewage Treatment Plant Mobile Compact

Mbr Containerized Package Integrated Sewage Treatment Plant Mobile Compact
Mbr Containerized Package Integrated Sewage Treatment Plant Mobile Compact Mbr Containerized Package Integrated Sewage Treatment Plant Mobile Compact

Large Image :  Mbr Containerized Package Integrated Sewage Treatment Plant Mobile Compact

Product Details:
Place of Origin: China
Brand Name: CK
Certification: ISO9001
Model Number: MBR
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: CN¥68000~CN¥10000/T
Packaging Details: export packing
Delivery Time: 30 days, negotiable
Payment Terms: 50% prepaid, 50% paid before shipment
Supply Ability: 10 sets per month

Mbr Containerized Package Integrated Sewage Treatment Plant Mobile Compact

Description
Treatment Process:: AO+MBR Cleaning Method: Online Air Wash ,backwash
Treated Capacity: 1-300m3/h Marketing Type: Ordinary Product
Certification: CE And ISO9001 Applicable Industries: Hotels, Building Material Shops, Manufacturing Plant, Food
Application: Domestic And Municipal Sewage Treatment Core Component Warranty Period: 1 Year
High Light:

Compact Integrated Sewage Treatment Plant

,

Package Integrated Sewage Treatment Plant

,

Mbr Package Sewage Treatment Plant

Industrial Mbr Containerized Package Mobile Compact Integrated Sewage Waste Water Wastewater Treatment Plant

Product Description

 

The treatment effect of the integrated sewage treatment equipment is better than that of the fully mixed type or the two-stage series fully mixed biological contact oxidation tank.

 

It is smaller than the activated sludge tank, has strong adaptability to water quality, good impact load resistance, stable effluent water quality, and does not cause sludge swelling.

 

A new type of elastic three-dimensional filler is used in the tank, which has a large specific surface area, and the microorganisms can easily hang and remove the film.

 

Under the same organic load condition, the removal rate of organic matter is high, and the solubility of oxygen in the air can be improved.

 

Mbr Containerized Package Integrated Sewage Treatment Plant Mobile Compact 0

 

Product Features

 

1.  Settling pond:apply inclind tube settling with high efficiency,small volume of settling pond.

2.  Filtering pond:apply light filter material,water power for backwashing,so there is no need of backwashing pump, and it saves electricity.

3.  Contact sterilized pond:mixing thimerosal and wastewater to ensure the out water index.

4.  All of the system applies integrated treatment as equipment nucleus,assisted pump,blower and thimerosal dosing equipment.

 

Product Advantages

 

1>.  It can be buried below the surface of the earth. Plants and lawns can be planted on the upper part of the equipment. It can also be set indoors.
2>.  Fully automatic control, no professional management.
3>.  Simple operation, convenient maintenance, new technology, good effect and long service life.
4>.  The equipment can be arranged according to the standard, or can be specially arranged according to the terrain.

 

Application

 

villages, towns, office buildings, malls, hotels, sanatoriums, institutions, schools, troops, hospitals, highways, railways,
factories, mines, tourist attractions and so on

Technical Parameters

 

Model M1 M2 M3 M5 M7 M10 M20 M25
Capacity 1m3/h 2m3/h 3m3/h 5m3/h 7m3/h 10m3/h 20m3/h 25m3/h
Air blower 0.55KW 0.75KW 1.5KW 1.5KW 2.2KW 3.7KW 5.5KW 3.7*2KW
Pump 0.55KW 0.55KW 0.55KW 0.75KW 0.75KW 0.75KW 1.5KW 1.5KW

 

We support a variety of personalized customized services

 

FAQ

 

Q: How about the warranty?

A:  If there is any malfunction of the equipment during the warranty period, our company promises to propose a solution within 24 hours. If it is caused by non-human causes, our company provides repairs free of charge and guarantees that the equipment is running well again.

 

Q: How to install after the equipments arriving destination?

A: We will provide detailed illustrations to you. And we will send a technicians to guide for installation and debugging. after debugging equipment, he will teach your workers how to use it and how to maintain it.

 

Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 5-6 weeks.

 

Q: How could we trust you and your company? This is first time transaction?

A: Our company has more than 40 years professional experience. We cooperate over 1000 customers in China and overseas. Welcome to our company and watch our plant production condition any time.

 

Q: How to buy your idea products?
A: You can provide us your sewage sources,sewage quality ( COD, BOD, SS) , flow rate and ground area (connect us for more details).then our engineer will design the suitable solutions for you and prepare to give you best price.

 

Q: How to package the sewage treatment plant?
A: We use standard seaworthy package.

Contact Details
KaiYuan Environmental Protection(Group) Co.,Ltd

Contact Person: jessica

Send your inquiry directly to us (0 / 3000)